20+

Years Experience

Dual

Licensed

Orange

County Client

Starbucks

Trusted By

Before the first foundation is poured or the first wall goes up, every new construction project needs underground infrastructure. Water lines to bring clean water in, sewer lines or septic systems to carry wastewater away, storm drainage to prevent flooding - all invisible once construction is complete, but absolutely critical to the success of your project.

Centrel Services LLC specializes in complete site development and underground utility installation for new construction throughout Orlando, Sanford, and Central Florida. We're dual licensed as both a Florida Plumbing Contractor (CFC1430739) and Underground Utilities Contractor (CUC1225722), which means we handle everything from single-family lots to large commercial developments and municipal projects. Our clients include Orange County Government, Seminole County, Starbucks, and numerous builders and developers who depend on us to deliver quality underground work on schedule.

Dual Licensed: We hold both CFC1430739 (Plumbing) and CUC1225722 (Underground Utilities) licenses, qualifying us for comprehensive site work.

Our Underground Utility Services

Complete infrastructure installation for residential, commercial, and municipal projects.

Water Line Installation

We install water service lines from municipal mains to buildings, including meter connections, backflow prevention, and pressure regulation. All work meets local water authority requirements.

Sewer Line Installation

Gravity and force main sewer connections to municipal systems, including lateral lines, cleanouts, and lift stations where needed. We handle permitting and inspections.

Storm Drainage Installation

Complete storm water management including underground piping, catch basins, retention ponds, and outlet structures. We design systems that meet environmental regulations.

Septic System Installation

For properties without access to municipal sewer, we design and install complete septic systems including tanks, drain fields, and distribution boxes that meet Florida Department of Health requirements.

Lift Station Installation

When gravity won't work, we install lift stations with wet wells, sewage pumps, force mains, control panels, and alarm systems for reliable uphill sewage pumping.

Site Grading & Restoration

After underground installation, we restore sites to proper grade, compact fill material, and prepare surfaces for landscaping or paving. We leave your site ready for the next phase.

Projects We Handle

Centrel Services provides site development and underground utilities for all types of construction projects:

  • Residential Subdivisions: Complete underground infrastructure for new home developments
  • Commercial Buildings: Office parks, retail centers, restaurants, and industrial facilities
  • Municipal Projects: Government facilities, parks, and public infrastructure
  • Multi-Family Developments: Apartment complexes, townhomes, and condominiums
  • Institutional Facilities: Schools, churches, and community centers

Major clients include Orange County Government, Seminole County, and Starbucks, who trust us with critical infrastructure projects.

Underground Utility Installation
Professional underground utility installation

Our Process

How It Works

From initial planning to final inspection, we manage every phase of underground utility installation to keep your project on schedule and within budget.

We review your site plans, survey existing conditions, and develop a detailed estimate for all underground utility work. You'll know exactly what the project entails and what it will cost.

We handle all permit applications with local governments, water authorities, and health departments. This includes plan submittal, addressing review comments, and securing all necessary approvals.

Before excavation, we coordinate utility locates to mark existing underground infrastructure. We prepare access routes, set up erosion control, and mobilize equipment to the site.

Our crews excavate trenches, install underground piping, construct structures, and backfill to proper compaction. We follow engineered plans and maintain safety throughout the process.

We pressure test water lines, conduct flow testing on sewer lines, and coordinate all required government inspections. Nothing is considered complete until it passes inspection.

We restore disturbed areas to proper grade and provide as-built drawings documenting the exact location of all installed utilities. This documentation is critical for future work.

Our Process

Why Choose Centrel Services?

Builders, developers, and municipalities choose us for critical underground infrastructure projects.

  • Dual Licensed: We hold both Plumbing Contractor (CFC1430739) and Underground Utilities Contractor (CUC1225722) licenses, qualifying us for comprehensive site work
  • Proven Track Record: Major clients including Orange County Government, Seminole County, and Starbucks trust us with critical projects
  • Full-Service Capabilities: Single source for all underground utilities - water, sewer, storm, septic, and lift stations
  • Permitting Expertise: We navigate complex permitting processes with local governments and utility authorities
  • On-Time Delivery: We understand construction schedules and coordinate our work to keep projects moving
  • Quality Workmanship: Over 20 years of underground utility experience in Central Florida
Service Areas

Service Areas

Centrel Services provides site development and underground utility installation throughout Central Florida:

Request a Quote (321) 363-1995

Frequently Asked Questions About Site Development

Click any question below to reveal the answer.

Contact Us

Costs vary widely based on project size, site conditions, and local requirements. A single-family lot might cost $15,000-$30,000 for complete utilities, while larger commercial or subdivision projects require detailed estimates. Call (321) 363-1995 for a project quote.

Timeline depends on project scope and permitting. Simple residential lots may take , while complex commercial projects or subdivisions can require several months. Permitting often takes longer than construction.

Yes. We coordinate all permitting with local governments, handle plan reviews, arrange inspections, and ensure your project meets all code requirements. This includes water, sewer, storm drainage, and septic permits.

Absolutely. We work alongside builders, general contractors, and developers on commercial and residential projects throughout Central Florida. We coordinate schedules, communicate progress, and complete work on time.

We hold dual Florida licenses: Plumbing Contractor (CFC1430739) and Underground Utilities Contractor (CUC1225722). This qualifies us for comprehensive site development work including water, sewer, storm, septic, and lift stations.

Ready to Start Your Project?

Call (321) 363-1995 for professional site development and underground utility installation in Central Florida.

To Top